2-Zone Boiler Manifold Header

Two-Zone Carbon Steel Boiler Manifold Header

Description
Our 2-zone carbon steel manifold header is ideal for all hot water boiler heating systems because it minimizes labor and piping space by permitting direct supply or return boiler connections to two, three, or four zones. Durable forged steel Schedule 40 pipe construction, with fully-welded seams, is pressure-tested before leaving the factory. Generous spacing between the zone legs allows plenty of tool room, requiring less time and hassle to connect each zone.

FAQ

Have a Question?

VIDEOS

ITEM NUMBER UPC SIZE CONFIGURATION DESCRIPTION LIST PRICE CASE CARTON  
355-392 662545116105 1" x 1" x 3/4" (x2) MNPT; 2 Branches 1" x 3/4" w/ 2 Zones Carbon Steel Manifold Header $79.44 16 1 PURCHASE
355-402 662545095905 1-1/4" x 1-1/4" x 3/4" (x2) MNPT; 2 Branches 1-1/4 x 3/4 w/ 2 Zones Carbon Steel Manifold Header $53.94 16 1 PURCHASE
355-412 662545095936 1-1/4" x 1-1/4" x 1" (x2) MNPT; 2 Branches 1-1/4 x 1 w/ 2 Zones Carbon Steel Manifold Header $64.29 16 1 PURCHASE
355-422 662545095967 1-1/2" x 1-1/2" x 3/4" (x2) MNPT; 2 Branches 1-1/2 x 3/4 w/ 2 Zones Carbon Steel Manifold Header $80.52 16 0 PURCHASE
355-432 662545095998 1-1/2" x 1-1/2 x 1" (x2) MNPT; 2 Branches 1-1/2 x 1 w/ 2 Zones Carbon Steel Manifold Header $81.39 16 1 PURCHASE